Commercial Roof Repair
Leaks at seams, curbs, drains, and metal laps traced and fixed with matching material.
Commercial Roof RepairInstall, Replace, Repair
Commercial roofing services in Ashland for every low-slope and metal roof we work on, plus full replacement when a roof is past repair.

Our Services
Each of our commercial roofing services in Ashland has its own page with fit checks, roof conditions, the process, and answers.
Leaks at seams, curbs, drains, and metal laps traced and fixed with matching material.
Commercial Roof RepairHeat-welded white sheet for warehouses, retail, and offices, with every lap probed.
TPO RoofingRubber membrane with primed, taped seams for simple roofs and dry-roof recovers.
EPDM RoofingPlant roofs replaced bay by bay, with exhaust zones and walkways detailed.
Industrial RoofingStanding seam and R-panel installs, retrofits over flat roofs, and repairs.
Commercial Metal RoofingCompare Systems
TPO, EPDM, PVC, and metal each solve a different problem, so the building and its drainage drive the choice.
| Factor | TPO | EPDM | PVC | Metal |
|---|---|---|---|---|
| Slope | Low slope | Low slope | Low slope | Pitched panels |
| Seams | Heat-welded | Taped or glued laps | Heat-welded | Panel laps or seamed ribs |
| Surface color | Mostly white | Mostly black, white made too | Mostly white | Painted steel |
| Fit | Offices, retail, warehouses | Cold-weather flexibility, simple roofs | Grease or chemical exhaust | Shops, plants, ag buildings |
Tell us the building type, the roof on it now, and what you are seeing. The roof walk sorts out the rest.
Commercial Roof Replacement
Moisture in the old roof and the number of existing layers decide between them. Confirm recover limits with the permit office.
| Factor | Tear-Off | Recover |
|---|---|---|
| Wet insulation | Removed and replaced | Must be cut out first |
| Deck inspection | Full view of the deck | Spot checks only |
| Existing layers | Resets to zero | Limited by code and roof weight |
| Debris and noise | Higher | Lower |
| Drain and edge heights | Reset to the new roof | Raised with added layers |
Replacement Planning
Planning starts with a roof survey. The findings decide between repair, recover, tear-off, and new metal.
The survey records the membrane or panels, core samples, drains, scuppers, edge metal, and every curb and penetration.
Core cuts and a moisture survey show wet insulation and how many roofs sit on the deck.
The roof system, insulation plan, and taper are chosen from the findings.
Sections are scheduled so the building stays open, with access for cranes, dumpsters, and staging.
Seams, drains, and edges are checked and the finished roof is photographed.
Replacement Questions
More answers are on the commercial roofing FAQ.

Moisture
Infrared scans at dusk, capacitance or impedance meters on a grid, core cuts, and soft spots underfoot all point to wet boards. A roof can look fine and still hide them.
Core samples also count the roofs stacked on the deck.
Taper
When ponding stays more than a couple of days, dirt rings mark low spots, drains sit high, or water traps behind curbs. Replacement is the time to add it, since the old roof is already off.
Edges
They are replaced or reset at the new roof height and sealed to the new membrane: new drain bodies or inserts, rebuilt scuppers, edge metal on wood nailers, and overflows where drains lack a backup.
Staying Dry
The crew removes only what it can rebuild and seal that workday, checks the forecast first, and ties every open edge to the old roof with a night seal. Plastic inside protects stock below.
Layers
From the deck up: an optional vapor retarder, polyiso insulation, taper or crickets for slope, cover board, membrane, then flashing and edge metal. Most leaks start where membrane meets a curb or edge.
Tear-Off Cost
Hidden conditions: rusted deck flutes, rotted nailers, large wet areas, stacked old roofs, and broken drains. Unit prices for deck and nailer work are agreed before tear-off starts.
Taxes
It can. IRS Publication 946 lists roofs on nonresidential buildings among qualified improvements. For tax years beginning in 2026 the limit is $2,560,000. Keep itemized invoices and talk with your CPA.
Tell us the roof and what is going wrong. We start with a survey.